|
|
|
|
Foundation forms receive a final inspection before the concrete is installed. |
||
|
Preparations are underway for a second level to an existing one-story, brick veneer home. |
Hardwood flooring is carefully installed around a beautiful tile mosaic. |
|
|
|
A winding hardwood stair will soon lead up to 2 new bedrooms, a library, master bath, and storage room. |
Home | About | Portfolio | Services | Generations | Email Us
Website designed and maintained by
Bogart
Designs
Copyright © 2008 Ronald L. Siebler. All Rights Reserved.